Failed Septic System Replaced

Premature drainfield failure evaluation

Southern Water and Soil replaced a PTI multi-pipe system that failed within a 3 year period. The PTI 9 pipe or ADS multi-pipe system is a product that receives a reduction in drainfield size that allows a more affordable solution.

image
Failed PTI Drainfield

There are usually more than one reason a drainfield fails. One must look at the amount of water, fats, oils, and grease that enter the septic system. When a system is reduced in size due to the product it leaves very little room for error.

image
Grease and Sludge Buildup

Let SWS review your situation and provide you with septic solutions.

image
Infiltrator System

Author: Greg Mayfield

I am the owner of Southern Water and Soil a wastewater company in Florida.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s